Neighborhood Sidewalk Improvement Program - Summer 2020

2020 Construction Map


This project is one of a number of different construction projects occurring in the Village in 2020. A copy of the 2020 construction map will be posted here once its available.



Project Description


The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. Often, tree roots that push up sections of sidewalks and the Midwest’s freeze/thaw cycle cause sections of sidewalk to be defective and or deteriorate. Village staff survey sidewalks based on logical geographic areas to determine which portions are to be replaced.

In addition to the replacement of failed sidewalk squares, the Village also installs Americans with Disabilities Act (ADA) required ramps at intersections and replaces select curbs adjacent to the sidewalks. In total, approximately 6% of Village sidewalks are replaced each year. All replacements are performed by the Village’s contractor.

In 2020, the Village will focus on sidewalks located in the Charlemagne, Lone Tree and Sunset View Subdivisions. A map of the area to be included can be found at this link.

Enabling Resolution

Once the Village Board has awarded a contract for this work, a copy of the enabling resolution will be posted here.

Project Notifications

Once a copy of the project notification to impacted residents is available, it will be posted here.

Project Updates


January 27, 2020 - Work Announcement

Details and a work schedule will be available when this project is awarded in spring 2019.