Completed Street Projects
-
Arterial Sidewalk Program - Summer 2019
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2019 program will focus on improvements on the sidewalk along Willow Road and Landwehr Road between Willow and Techny Road.
Link to page -
Arterial Sidewalk Program - Summer 2020
In addition to the routine sidewalk removal and replacement program, the Village maintains the sidewalks located adjacent to major arterial streets within the Village, such as Dundee Road. These sidewalks are heavily used throughout the year and provide a critical link between different areas of the community for pedestrians. This program identifies sections of deteriorated or defective sidewalk on at least one side of the arterial road and replaces or repairs them to remove potential hazards using the same replacement process outlined in the routine sidewalk removal and replacement program. In 2020, the Village will complete improvements along Landwehr Road between Keystone Road and Huehl Road and Sanders Road between Terri-Lyn Lane and Lake-Cook Road.
Link to page -
Asphalt Street Resurfacing Program - 2017
Asphalt streets are selected for rehabilitation based on a computerized pavement management system (IMS), a thorough review of the condition of the pavement surface/base conditions by Public Works staff, pavement condition in relation to the adjacent streets, timing to select and complete the most cost effective rehabilitation measure and coordination with other Village infrastructure projects.
Link to page -
Asphalt Street Resurfacing Program - 2018
Asphalt streets are selected for rehabilitation based on a computerized pavement management system (IMS), a thorough review of the condition of the pavement surface/base conditions by Public Works staff, pavement condition in relation to the adjacent streets, timing to select and complete the most cost effective rehabilitation measure and coordination with other Village infrastructure projects. The 2018 program will focus on rehabilitating portions of Hillside Drive, Lakeside Avenue, oak Avenue, Phillips Avenue, Prince Street, Raintree Lane, Sherman Drive, Snowbird Lane and Sunburst Lane.
Link to page -
Asphalt Street Resurfacing Program - 2019
Asphalt streets are selected for rehabilitation based on a computerized pavement management system (IMS), a thorough review of the condition of the pavement surface/base conditions by Public Works staff, pavement condition in relation to the adjacent streets, timing to select and complete the most cost effective rehabilitation measure and coordination with other Village infrastructure projects. The 2019 program will focus on rehabilitating portions of Woodlawn Road and the entirety of Penfold Place and Picardy Circle.
Link to page -
Asphalt Street Resurfacing Program - 2020
Asphalt streets are selected for rehabilitation based on a computerized pavement management system (IMS), a thorough review of the condition of the pavement surface/base conditions by Public Works staff, pavement condition in relation to the adjacent streets, timing to select and complete the most cost effective rehabilitation measure and coordination with other Village infrastructure projects. The 2020 program will focus on Brentwood Road, Carol Court, Church Street, Illinois Road, Maple Avenue, Pheasant Creek Road, Palm Lane, Ridgewood Drive, Sunset Lane, and Sycamore Lane.
Link to page -
Asphalt Road Rehabilitation - 2021
The 2021 asphalt street program includes resurfacing portions of Founders as well Longmeadow Road and both segments of Peeblebrook.
Link to page -
Bicycle/Pedestrian Improvements - 2020
In addition to the routine sidewalk removal and replacement programs, the Village completes improvements for bicycle and pedestrians as outlined in the Master Bicycle and Pedestrian Plan. In 2020, the Village will construct the Farnsworth-Birch-Koepke-Miller bicycle boulevard.
Link to page -
Shermer Road Bridge/CBD Improvements - 2018
The Central Business District (CBD) is the Village’s downtown area, which includes retailers and restaurants, the Village Green Park and Northbrook’s Metra Station. Following the 2017 work on the streets and streetscape of the CBD, the 2018 project will finalize the project by replacing the Shermer Road bridge and completing some minor paving work on Shermer Road.
Link to page -
Concrete Street Reconstruction - 2018
The Village of Northbrook proactively reviews the condition of our utility systems, water and sewers, on an annual basis and updates our recommended five-year Capital Improvement Plan. The 2018 program will focus on the complete reconstruction of Anthony Trail between Macarthur and Commercial Avenues.
Link to page -
Concrete Street Panel Replacement - 2019
The Village of Northbrook proactively reviews the condition of our utility systems, water and sewers, on an annual basis and updates our recommended five-year Capital Improvement Plan. The 2019 program will focus on concrete panel replacements in the Heathercrest East subdivision.
Link to page -
Concrete Street Panel Replacement - 2020
The 2020 concrete street programs involves completing panel replacements in the Sunset Fields subdivision.
Link to page -
Concrete Street Panel Replacement - 2021
The 2020 concrete street programs involves completing panel replacements in the Sutton Point subdivision.
Link to page -
Central Business District Infrastructure - 2017
The Central Business District (CBD) is the Village’s downtown area, which includes retailers and restaurants, the Village Green Park and Northbrook’s Metra Station. Work will be done on the streets within the Central Business District including Shermer Road between Maple Avenue and Waukegan Road, Meadow Road between Walters Avenue and Cherry Lane, Cherry Lane between the railroad underpass and Keystone Avneue, and Church Street between Keystone Avenue and Shermer Road.
Link to page -
Lee Road Reconstruction - Summer 2017
The Village of Northbrook will be reconstructing and converting Lee Road to asphalt. Lee Road serves as the primary connector between Lake-Cook Road and the Williamsburg Subdivision as well as the properties on Longmeadow Road and the Cove School.
Link to page -
Lone Tree Subdivision Phase II - Summer 2017
The Village of Northbrook proactively reviews the condition of our utility systems, water and sewers, on an annual basis and updates our recommended five-year Capital Improvement Plan. Water mains are scheduled for replacement on Bayberry Drive (between Laburnum Drive and Huehl Road), Sorrel Drive (between Laburnum Drive and Huehl Road), Tamarind Drive (between Laburnum Drive and Huehl Road), Banyan Drive (between Sorrel Drive and Tamarind Drive), and Huehl Road (between Harris Drive and Tamarind).
Link to page -
Sidewalk Improvement Program - Summer 2017
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. Often, tree roots that push up sections of sidewalks and the Midwest’s freeze/thaw cycle cause sections of sidewalk to be defective and or deteriorate. Village staff survey sidewalks based on logical geographic areas to determine which portions are to be replaced.
Link to page -
Sidewalk Improvement Program - Summer 2018
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2018 program will focus on the areas between Sanders Road and I-294 as well as the sidewalks along Raintree Lane, Snowbird Lane and Sunburst Lane.
Link to page -
Neighborhood Sidewalk Program - Summer 2019
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2019 program will focus on improvements in the Sutton Point and Wildebrook Subdivisions.
Link to page -
Neighborhood Sidewalk Program - Summer 2020
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2020 program will focus on improvements in the Charlemagne, Lone Tree, Sunset View, Villas North, Salceda North, Sunny Acres subdivisions and Sky Harbor Business Park.
Link to page -
Neighborhood Sidewalk Program - Summer 2021
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2021 program will focus on improvements in the Northbrook East, Skokie Highlands and Timber Hill Estates as well as at least one side of Pfingsten Road from Highland Road to Walters Avenue.
Link to page
-
Public Works
Physical Address
655 Huehl Road
Northbrook, IL 60062
Phone: 847-272-4711Fax: 847-272-3629Emergency: 847-564-2060 (After Hours Police Non-Emergency Number)
Office Hours
Monday - Friday
7 a.m. - 3 p.m.
(No deliveries after 2 p.m.)
After-Hours Emergencies
Please call the Police Department's non-emergency line at 847-564-2060 for after hours emergencies including water main breaks, leaking meters, sewer back-ups or flooding.