- Home
- Services
- Construction Projects
- Current Projects
Current Projects
-
Arterial Sidewalk Program - Summer 2022
In addition to the routine sidewalk removal and replacement program, the Village maintains the sidewalks located adjacent to major arterial streets within the Village, such as Dundee Road. These sidewalks are heavily used throughout the year and provide a critical link between different areas of the community for pedestrians. This program identifies sections of deteriorated or defective sidewalk on at least one side of the arterial road and replaces or repairs them to remove potential hazards using the same replacement process outlined in the routine sidewalk removal and replacement program. In 2022, the Village will complete improvements along Pfingsten Road, from Walters Avenue to Maria Avenue.
Link to page -
Willow Creek Subdivision - 2021-2022
The Willow Creek projects will be completed in two phases. The first phase will include water main improvements including the replacement of the original 1960's main on Longmeadow Drive, Elm Ridge Drive and Kingston Drive. Following completion of that work, asphalt roadway resurfacing will be completed on those same roadways. Phase two work will be completed in 2022 on the portions of Canterbury, Woodland and Wood located within the Willow Creek subdivision.
Link to page -
Waukegan Road Resurfacing - 2021
The Illinois Department of Tranportation will be completing a SMART overlay (resurfacing) of Waukegan Road between Lake-Cook Road in Deerfield and Ammer Road in Glenview.
Link to page -
South Lane Water Main Improvements - 2022
The South Lane Water Main Improvements project will include both water main replacement and asphalt resurfacing. The first part of the project will include water main improvements including the replacement of the original 1940's main on South Lane, while also looping the system to Driftwood Lane to further improve the system. Following completion of that work, asphalt roadway resurfacing will be completed on South Lane.
Link to page -
Shermer Road Sidepath - 2021
The Village of Northbrook has begun Preliminary Engineering to investigate the possibility of constructing a multi-use side path along Shermer Road. The anticipated project would involve the construction of a new path on the east side of Shermer Road between Willow Road and Walters Avenue that will provide a connection to the recently completed multi-use path in the Village of Glenview.
Link to page -
Neighborhood Sidewalk Program - Summer 2022
The Village of Northbrook systematically surveys public sidewalks to identify defective and deteriorated sections of sidewalk that create a potential hazard and a liability for the Village. The 2021 program will focus on improvements in the Kiest, Northbrook Manor, and Park Place Estates Subdivisions.
Link to page -
Dauphine Avenue Water Main Improvements - 2022
This project will focus on the replacement of the original 1960's water main along Dauphine Avenue (from 3856 Dauphine Avenue to Charlemagne Drive).
Link to page -
Cedar Lane Reconstruction - 2022
The 2022 Cedar Lane project involves reconstruction of Cedar Lane between Cherry Lane and Walters Avenue.
Link to page